Main phases of repair works in the apartment.
How to begin repair works of the apartment?
The first phase of the repair of old homes is the damage and taking apart first off of the dilapidated walls and partition walls, eliminating the wall and ceiling finish. This stage is one of the most "unclean" phases of the repair.
One more among the most essential and "dusty" works is the window block replacement. It is essential to do this to start with due to the fact that dirt and dust will be unallowable throughout following phases and it is restricted at all to open windows throughout painting and wallpaper works (large drops of the temperature level and wetness are unallowable). After installing windows and windowsills it is required to load them instantly in polyethylene movie and to cover windowsills in addition by the fiber board (in order to avoid scratches).
The following stage is electrical wiring. Wiring can be installed in walls or along the floor. Circuitry is made inside the pipelines to guarantee electrical safety and increase reliability. The pipe safeguards circuitry from external damages and enables to replace the wire completely without breaking walls and flooring simply by inserting the brand-new wire instead of the old one.
House Painting follows the electrical wiring. The frequent error throughout the simultaneous conducting of such works takes place when workers forget to set out one of the cables and home painters have actually already plastered and ravelled the wall. As a result, additional works are necessary to seal chases after on the completed wall. The locations of the feed switch and wall outlet location and their number need to be thought-out in advance. The scheme of power circuitry is typically consisted of into the design project.
Later on the system need to be ready to service in case of failures. In addition to the circuitries, the telephone cable television and the TV cable are set out. The power cable television need to not be laid out near the telephone and antenna cables to prevent noise pickup and disturbance. The most strange moment is setting out the television cable. In order to make 2 (or three) television set in the home the second cable is typically just "securely soldered" in parallel, so the cable resistance is lowered. As an outcome, the display screen quality is degraded, many programs can't be received and etc. In order to prevent such circumstance it is essential to invite an expert with special equipment. He will determine the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.
Painting is the most long-lasting process, that is why it is carried out at the same time in all properties, if it is possible. Delays are related to the technology. Each applied layer of the plaster (or filling in finishing) should dry completely before the work will continue.
Works in sanitary plans and the cooking area start at the same time with house painting. It is better to satisfy so-called "unclean" operate in the first place and all at once. In accordance with the strategy of the sanitary specialist location welding, wall chasing and pipe run are conducted. Steam radiator admissions are prepared, taps and brackets are installed, but radiators are not installed.

After circuitry, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of electrical wiring are insulated and laid out into rosette plates. Sockets and breakers are not installed during this stage in order to save their surface area look. The surface puttying of walls is performed concurrently. The technically specific control of drying of the layer of the plaster (filling) is performed by drymeter. It is an unique instrument that measures wetness of the material.
The following phase is the procedure of fill. Fill can be made with various products-- from usual masonry cement-sand mixture to self-aligning floorings. The advantage of the easy mixture is its cheapness, the downside is that such mix is much more difficult lined up at the level and the last dry time of such fill is 40 days, only then the next stage of the deal with floor can be performed, i.e. the duration is too long. Self-leveling self-aligning floors are a lot more costly, however more technological. Lining up occurs practically "automatically" i.e. fluid option of mixture is put out, then it runs and you get the horizontal surface area. The final dry time is 15 days i.e. you have substantial time economy. The system "warm flooring" is installed into the fill. If the so-called "damp procedures" are inapplicable the technology of the dry lining up (the fill technology) is used bases for floors with adjustable floor battens are mounted.
After fill door boxes and door are set up. Installation of doors should take into the account thickness of future floor covering. After installation the door can be removed its hinges and eliminated until completion of repair work or loaded into polyethylene film to safeguard from damages. Concurrently ceiling can be painted and the tile can be laid in that facilities where it was planned. The tile needs to be laid on the absolutely dry overlay.
Finishing of the flooring mounting depends upon the prepared covering. In most cases (if finish covering get leak detection is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the flooring by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to offer the close fixing of plywood and long-lasting service of the floor without squeak and bulging. The plywood gives the additional heat- and acoustic insulation. After mounting of the plywood is finished, wallpaper for painting can be pasted on walls.
In properties where finish covering of the flooring is laminated flooring or parquet hoard, the regular wallpapers are pasted (not for painting) in the first location. Then the floor covering is mounted.
If finish covering of the floor is the block parquet, the parquet is laid in the first place, then it is scraped and covered Click for more info by one layer of lacquer. After this the regular wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The mentioned consequence is linked just with such scrambling procedure when the great quantity of dust is created. In spite of the fact that great floor mills are equipped with the vacuum cleaner, the enough quantity of dust is precipitated on surrounding topics including walls. Dust is really acerbic and is badly cleaned off. That is why in order not to damage wallpapers, they are pasted after scrambling and in order the parquet do not soak up the surplus moisture it is covered by the one layer of lacquer before wallpaper pasting.
After this the main works can be thought about to be finished. It is left only to set up the plinths, ornamental components, breakers and sockets, curtain holders, to hang doors, plant-bands and others.
In conclusion it is necessary to keep in mind that the sequence of works was noted in general and can change depending on the guaranteed scenario-- the variety of rooms in premise, your resources, peculiarities of the construction of the multilevel properties. It is based upon common sense and every person capable of analysis can individually create such a series.